#4 rock wall week 3 of construction:

  • Writer: David Buckner
    David Buckner
  • Oct 25, 2021
  • 1 min read

Updated: Oct 27, 2021

This is the start of the 4th week from beginning our rock wall project on #4. The rock placer was out of town the second week, so this is only the start of the 3rd week of actual construction. The wall is close to being complete. Two levels high, with soil built up from the top level of rock to the top of the fairway. I’m expecting this project to be complete by the end of the week or very close to it.


 
 
 